{"id":2160,"date":"2023-02-02T17:41:39","date_gmt":"2023-02-02T20:41:39","guid":{"rendered":"https:\/\/previews.elleven.digital\/acocearense\/?post_type=noticia&#038;p=2160"},"modified":"2025-05-07T17:42:06","modified_gmt":"2025-05-07T20:42:06","slug":"sinobras-recebe-visita-tecnica-da-hatch-para-alinhar-definicoes-e-cronograma-do-projeto-de-engenharia-da-nova-aciaria","status":"publish","type":"noticia","link":"https:\/\/previews.elleven.digital\/acocearense\/en\/noticia\/sinobras-recebe-visita-tecnica-da-hatch-para-alinhar-definicoes-e-cronograma-do-projeto-de-engenharia-da-nova-aciaria\/","title":{"rendered":"SINOBRAS receives a technical visit from Hatch to align definitions and schedule of the engineering project for the New Steel Plant"},"content":{"rendered":"<p>On January 24, 25 and 26, SINOBRAS, a company of the A\u00e7o Cearense Group, received representatives from Hatch for a technical visit with the aim of defining the details of the engineering project for the new steel plant and drawing up a work schedule.<\/p>\n<p>Present at the event were members of Grupo A\u00e7o Cearense&#039;s board of directors \u2013 Ian Corr\u00eaa (Vice President of Operations), Milton Lima (Industrial Director), Edgard Corr\u00eaa (Director of Supplies and Logistics), and the Nova Acetaria team (managed by SINOBRAS), as well as representatives from Hatch and Vale, who gave presentations and discussed technical issues. The group also visited the site of the Nova Acetaria plant and toured the construction site of Tecnored (a Vale subsidiary) in the Marab\u00e1 Industrial District.<\/p>\n<p><strong>Understand from the beginning\u00a0<\/strong><\/p>\n<p>In May 2022, SINOBRAS and Vale signed a commitment to develop a new steel billet production plant in Marab\u00e1. Following the established schedule, after several months of discussions, Hatch was chosen to lead the project&#039;s development. On January 9, 2023, the\u00a0<em>kick-off meeting<\/em>\u00a0(first meeting) to start the project, which is expected to be completed in 6 months.<\/p>\n<p><strong>The division of responsibilities\u00a0<\/strong><\/p>\n<p>Under the signed agreement, Vale supports the project by issuing guarantees to facilitate the financing contracted by SINOBRAS for the installation of the new steel plant. SINOBRAS is responsible for the engineering studies and implementation and operation of the plant, as well. Production at the new steel plant is expected to begin after\u00a0<em>startup\u00a0<\/em>from Tecnored, scheduled for the 2nd half of 2025.<\/p>\n<p>Soon after signing the agreement, SINOBRAS began structuring its team and created a management team to oversee the new project. In addition to generating new jobs and revenue, the new steel plant will guarantee the necessary supplies for SINOBRAS&#039;s growth through expansion, as well as provide the conditions for the development of a Metal-Mechanical Hub in Marab\u00e1.<\/p>","protected":false},"featured_media":2156,"template":"","meta":{"_acf_changed":false,"inline_featured_image":false},"categoria-noticia":[],"class_list":["post-2160","noticia","type-noticia","status-publish","has-post-thumbnail","hentry"],"acf":{"link":""},"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v25.9 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>SINOBRAS recebe visita t\u00e9cnica da Hatch para alinhar defini\u00e7\u00f5es e cronograma do projeto de engenharia da Nova Aciaria - Grupo A\u00e7o Cearense<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/previews.elleven.digital\/acocearense\/en\/noticia\/sinobras-recebe-visita-tecnica-da-hatch-para-alinhar-definicoes-e-cronograma-do-projeto-de-engenharia-da-nova-aciaria\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SINOBRAS recebe visita t\u00e9cnica da Hatch para alinhar defini\u00e7\u00f5es e cronograma do projeto de engenharia da Nova Aciaria - Grupo A\u00e7o Cearense\" \/>\n<meta property=\"og:description\" content=\"Nos dias 24, 25 e 26 de janeiro, a SINOBRAS, empresa do Grupo A\u00e7o Cearense,(...)\" \/>\n<meta property=\"og:url\" content=\"https:\/\/previews.elleven.digital\/acocearense\/en\/noticia\/sinobras-recebe-visita-tecnica-da-hatch-para-alinhar-definicoes-e-cronograma-do-projeto-de-engenharia-da-nova-aciaria\/\" \/>\n<meta property=\"og:site_name\" content=\"Grupo A\u00e7o Cearense\" \/>\n<meta property=\"article:modified_time\" content=\"2025-05-07T20:42:06+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/previews.elleven.digital\/acocearense\/wp-content\/uploads\/2025\/05\/IMG_4770-editada-2048x1370-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2048\" \/>\n\t<meta property=\"og:image:height\" content=\"1370\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/previews.elleven.digital\/acocearense\/noticia\/sinobras-recebe-visita-tecnica-da-hatch-para-alinhar-definicoes-e-cronograma-do-projeto-de-engenharia-da-nova-aciaria\/\",\"url\":\"https:\/\/previews.elleven.digital\/acocearense\/noticia\/sinobras-recebe-visita-tecnica-da-hatch-para-alinhar-definicoes-e-cronograma-do-projeto-de-engenharia-da-nova-aciaria\/\",\"name\":\"SINOBRAS recebe visita t\u00e9cnica da Hatch para alinhar defini\u00e7\u00f5es e cronograma do projeto de engenharia da Nova Aciaria - Grupo A\u00e7o Cearense\",\"isPartOf\":{\"@id\":\"https:\/\/previews.elleven.digital\/acocearense\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/previews.elleven.digital\/acocearense\/noticia\/sinobras-recebe-visita-tecnica-da-hatch-para-alinhar-definicoes-e-cronograma-do-projeto-de-engenharia-da-nova-aciaria\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/previews.elleven.digital\/acocearense\/noticia\/sinobras-recebe-visita-tecnica-da-hatch-para-alinhar-definicoes-e-cronograma-do-projeto-de-engenharia-da-nova-aciaria\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/previews.elleven.digital\/acocearense\/wp-content\/uploads\/2025\/05\/IMG_4770-editada-2048x1370-1.jpg\",\"datePublished\":\"2023-02-02T20:41:39+00:00\",\"dateModified\":\"2025-05-07T20:42:06+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/previews.elleven.digital\/acocearense\/noticia\/sinobras-recebe-visita-tecnica-da-hatch-para-alinhar-definicoes-e-cronograma-do-projeto-de-engenharia-da-nova-aciaria\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/previews.elleven.digital\/acocearense\/noticia\/sinobras-recebe-visita-tecnica-da-hatch-para-alinhar-definicoes-e-cronograma-do-projeto-de-engenharia-da-nova-aciaria\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/previews.elleven.digital\/acocearense\/noticia\/sinobras-recebe-visita-tecnica-da-hatch-para-alinhar-definicoes-e-cronograma-do-projeto-de-engenharia-da-nova-aciaria\/#primaryimage\",\"url\":\"https:\/\/previews.elleven.digital\/acocearense\/wp-content\/uploads\/2025\/05\/IMG_4770-editada-2048x1370-1.jpg\",\"contentUrl\":\"https:\/\/previews.elleven.digital\/acocearense\/wp-content\/uploads\/2025\/05\/IMG_4770-editada-2048x1370-1.jpg\",\"width\":2048,\"height\":1370},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/previews.elleven.digital\/acocearense\/noticia\/sinobras-recebe-visita-tecnica-da-hatch-para-alinhar-definicoes-e-cronograma-do-projeto-de-engenharia-da-nova-aciaria\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"In\u00edcio\",\"item\":\"https:\/\/previews.elleven.digital\/acocearense\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Not\u00edcias\",\"item\":\"https:\/\/previews.elleven.digital\/acocearense\/noticias\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SINOBRAS recebe visita t\u00e9cnica da Hatch para alinhar defini\u00e7\u00f5es e cronograma do projeto de engenharia da Nova Aciaria\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/previews.elleven.digital\/acocearense\/#website\",\"url\":\"https:\/\/previews.elleven.digital\/acocearense\/\",\"name\":\"A\u00e7o Cearense\",\"description\":\"H\u00e1 mais de 45 anos no mercado brasileiro do a\u00e7o.\",\"alternateName\":\"A\u00e7o Cearense\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/previews.elleven.digital\/acocearense\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"SINOBRAS recebe visita t\u00e9cnica da Hatch para alinhar defini\u00e7\u00f5es e cronograma do projeto de engenharia da Nova Aciaria - Grupo A\u00e7o Cearense","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/previews.elleven.digital\/acocearense\/en\/noticia\/sinobras-recebe-visita-tecnica-da-hatch-para-alinhar-definicoes-e-cronograma-do-projeto-de-engenharia-da-nova-aciaria\/","og_locale":"en_US","og_type":"article","og_title":"SINOBRAS recebe visita t\u00e9cnica da Hatch para alinhar defini\u00e7\u00f5es e cronograma do projeto de engenharia da Nova Aciaria - Grupo A\u00e7o Cearense","og_description":"Nos dias 24, 25 e 26 de janeiro, a SINOBRAS, empresa do Grupo A\u00e7o Cearense,(...)","og_url":"https:\/\/previews.elleven.digital\/acocearense\/en\/noticia\/sinobras-recebe-visita-tecnica-da-hatch-para-alinhar-definicoes-e-cronograma-do-projeto-de-engenharia-da-nova-aciaria\/","og_site_name":"Grupo A\u00e7o Cearense","article_modified_time":"2025-05-07T20:42:06+00:00","og_image":[{"width":2048,"height":1370,"url":"https:\/\/previews.elleven.digital\/acocearense\/wp-content\/uploads\/2025\/05\/IMG_4770-editada-2048x1370-1.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/previews.elleven.digital\/acocearense\/noticia\/sinobras-recebe-visita-tecnica-da-hatch-para-alinhar-definicoes-e-cronograma-do-projeto-de-engenharia-da-nova-aciaria\/","url":"https:\/\/previews.elleven.digital\/acocearense\/noticia\/sinobras-recebe-visita-tecnica-da-hatch-para-alinhar-definicoes-e-cronograma-do-projeto-de-engenharia-da-nova-aciaria\/","name":"SINOBRAS recebe visita t\u00e9cnica da Hatch para alinhar defini\u00e7\u00f5es e cronograma do projeto de engenharia da Nova Aciaria - Grupo A\u00e7o Cearense","isPartOf":{"@id":"https:\/\/previews.elleven.digital\/acocearense\/#website"},"primaryImageOfPage":{"@id":"https:\/\/previews.elleven.digital\/acocearense\/noticia\/sinobras-recebe-visita-tecnica-da-hatch-para-alinhar-definicoes-e-cronograma-do-projeto-de-engenharia-da-nova-aciaria\/#primaryimage"},"image":{"@id":"https:\/\/previews.elleven.digital\/acocearense\/noticia\/sinobras-recebe-visita-tecnica-da-hatch-para-alinhar-definicoes-e-cronograma-do-projeto-de-engenharia-da-nova-aciaria\/#primaryimage"},"thumbnailUrl":"https:\/\/previews.elleven.digital\/acocearense\/wp-content\/uploads\/2025\/05\/IMG_4770-editada-2048x1370-1.jpg","datePublished":"2023-02-02T20:41:39+00:00","dateModified":"2025-05-07T20:42:06+00:00","breadcrumb":{"@id":"https:\/\/previews.elleven.digital\/acocearense\/noticia\/sinobras-recebe-visita-tecnica-da-hatch-para-alinhar-definicoes-e-cronograma-do-projeto-de-engenharia-da-nova-aciaria\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/previews.elleven.digital\/acocearense\/noticia\/sinobras-recebe-visita-tecnica-da-hatch-para-alinhar-definicoes-e-cronograma-do-projeto-de-engenharia-da-nova-aciaria\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/previews.elleven.digital\/acocearense\/noticia\/sinobras-recebe-visita-tecnica-da-hatch-para-alinhar-definicoes-e-cronograma-do-projeto-de-engenharia-da-nova-aciaria\/#primaryimage","url":"https:\/\/previews.elleven.digital\/acocearense\/wp-content\/uploads\/2025\/05\/IMG_4770-editada-2048x1370-1.jpg","contentUrl":"https:\/\/previews.elleven.digital\/acocearense\/wp-content\/uploads\/2025\/05\/IMG_4770-editada-2048x1370-1.jpg","width":2048,"height":1370},{"@type":"BreadcrumbList","@id":"https:\/\/previews.elleven.digital\/acocearense\/noticia\/sinobras-recebe-visita-tecnica-da-hatch-para-alinhar-definicoes-e-cronograma-do-projeto-de-engenharia-da-nova-aciaria\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"In\u00edcio","item":"https:\/\/previews.elleven.digital\/acocearense\/"},{"@type":"ListItem","position":2,"name":"Not\u00edcias","item":"https:\/\/previews.elleven.digital\/acocearense\/noticias\/"},{"@type":"ListItem","position":3,"name":"SINOBRAS recebe visita t\u00e9cnica da Hatch para alinhar defini\u00e7\u00f5es e cronograma do projeto de engenharia da Nova Aciaria"}]},{"@type":"WebSite","@id":"https:\/\/previews.elleven.digital\/acocearense\/#website","url":"https:\/\/previews.elleven.digital\/acocearense\/","name":"Cear\u00e1 Steel","description":"We have been in the Brazilian steel market for over 45 years.","alternateName":"A\u00e7o Cearense","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/previews.elleven.digital\/acocearense\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/previews.elleven.digital\/acocearense\/en\/wp-json\/wp\/v2\/noticia\/2160","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/previews.elleven.digital\/acocearense\/en\/wp-json\/wp\/v2\/noticia"}],"about":[{"href":"https:\/\/previews.elleven.digital\/acocearense\/en\/wp-json\/wp\/v2\/types\/noticia"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/previews.elleven.digital\/acocearense\/en\/wp-json\/wp\/v2\/media\/2156"}],"wp:attachment":[{"href":"https:\/\/previews.elleven.digital\/acocearense\/en\/wp-json\/wp\/v2\/media?parent=2160"}],"wp:term":[{"taxonomy":"categoria-noticia","embeddable":true,"href":"https:\/\/previews.elleven.digital\/acocearense\/en\/wp-json\/wp\/v2\/categoria-noticia?post=2160"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}